How much will a new bathroom cost? This estimator gives a ballpark price range for a bathroom renovation in the US, UK or Australia, based on published 2026 cost data from large trade-booking platforms. Choose your region and finish level, then add a contingency for surprises.
How the estimate works
- US: Angi reports that most bathroom remodels cost $70 to $250 per sq ft, with a national average of about $12,150 in 2026. We split that range into three equal bands (basic, mid-range, high-end) and multiply by your floor area. Angi lists demolition at $1,000–$2,300 and permits at $100–$1,000 as extras, which you can add.
- UK: Checkatrade (bathroom renovation, May 2026) puts a bathroom remodel at £1,500–£7,500 (average about £4,500), and Checkatrade (new bathroom, March 2026) says most homeowners spend £5,500–£8,000 on a new bathroom, with luxury renovations from £14,000.
- Australia: hipages, via Savings.com.au gives three brackets: budget A$8,000–A$15,000, standard A$15,000–A$35,000 and premium A$35,000+.
Typical price ranges (2026)
| Region | Basic | Mid-range | High-end |
|---|---|---|---|
| US (50 sq ft bath) | $3,500–$6,500 | $6,500–$9,500 | $9,500–$12,500 |
| UK | £1,500–£7,500 | £5,500–£8,000 | £14,000+ |
| Australia | A$8,000–A$15,000 | A$15,000–A$35,000 | A$35,000+ |
What drives the cost
- Moving plumbing. Keeping the toilet, shower and basin where they are is the single biggest saving.
- Size. Bigger rooms cost more in total, but small bathrooms often cost more per square foot because waterproofing, plumbing and fitting costs don’t shrink with the room.
- Tiling. Floor-to-ceiling tiling, small-format or natural-stone tiles add labour and material cost.
- Fixtures and finishes. A freestanding bath, frameless glass screen or wall-hung vanity can each add significantly.
- Hidden problems. Rot, water damage or old pipework uncovered during demolition is why a 10–15% contingency is sensible.
How to use the result
- Use the range to set a realistic budget before you call trades.
- Get at least three written, itemised quotes for the same scope of work.
- Check what each quote includes: waste removal, waterproofing, electrics, tiling and making good.
- Keep the contingency separate and only spend it if something unexpected comes up.
Estimates only, for planning. Prices vary by location, property and contractor. Figures were taken from the linked sources in November 2026 and may change.